Javascript must be enabled for the correct page display

Creating a Standardised Process to reduceWaste Time at Akka Technologies.

Verwoerd, Richard (2019) Creating a Standardised Process to reduceWaste Time at Akka Technologies. Design Project, Industrial Engineering and Management.

[img] Text
Master_IEM_Design Project_2019_RWVerwoerd.pdf
Restricted to Registered users only

Download (2MB)

Abstract

De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.

Item Type: Thesis (Design Project)
Supervisor:
Supervisor nameSupervisor E mail
Kloosterman, H.H.Kloosterman@rug.nl
Geertsema, A.A.A.A.Geertsema@rug.nl
Degree programme: Industrial Engineering and Management
Thesis type: Design Project
Language: English
Date Deposited: 21 Feb 2019
Last Modified: 12 Mar 2019 11:36
URI: http://fse.studenttheses.ub.rug.nl/id/eprint/19189

Actions (login required)

View Item View Item