Javascript must be enabled for the correct page display

Multi project, multi objective scheduling with resource constraints

A.A.I. Neijmeijer (2017) Multi project, multi objective scheduling with resource constraints. Master's Thesis / Essay, Industrial Engineering and Management.

[img] Text
Master_IEM__Research_Project_2_1.pdf - Other
Restricted to Registered users only

Download (525kB)

Abstract

De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.

Item Type: Thesis (Master's Thesis / Essay)
Degree programme: Industrial Engineering and Management
Thesis type: Master's Thesis / Essay
Language: English
Date Deposited: 15 Feb 2018 08:27
Last Modified: 15 Feb 2018 08:27
URI: https://fse.studenttheses.ub.rug.nl/id/eprint/14970

Actions (login required)

View Item View Item