Wolfshaar B.J. van de (2017) Designing and implementing postponed differentiation of hot dip galvanized finished goods at Tata Steel IJmuiden. Design Project, Industrial Engineering and Management.
Text
Master_IEM_Design_Project_2017_1.pdf - Other Restricted to Registered users only Download (7MB) |
Abstract
De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.
Item Type: | Thesis (Design Project) |
---|---|
Degree programme: | Industrial Engineering and Management |
Thesis type: | Design Project |
Language: | English |
Date Deposited: | 15 Feb 2018 08:34 |
Last Modified: | 15 Feb 2018 08:34 |
URI: | https://fse.studenttheses.ub.rug.nl/id/eprint/16286 |
Actions (login required)
View Item |