Reuvers, Koen (2018) A new policy for reactive scheduling in the process industry. Research Project, Industrial Engineering and Management.
Text
mIEM_2018_ReuversK.pdf Restricted to Registered users only Download (1MB) |
Abstract
De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.
Item Type: | Thesis (Research Project) |
---|---|
Supervisor name: | Kilic, O.A. |
Degree programme: | Industrial Engineering and Management |
Thesis type: | Research Project |
Language: | English |
Date Deposited: | 17 Aug 2018 |
Last Modified: | 26 Sep 2018 09:25 |
URI: | https://fse.studenttheses.ub.rug.nl/id/eprint/18327 |
Actions (login required)
View Item |