Zijlstra, Frank (2018) Improving Strategic Performance of Procurement at Besi APac. Design Project, Industrial Engineering and Management.
|
Text
Master_IEM_Design Project_[2018]_FrankZijlstra.pdf Restricted to Registered users only Download (4MB) |
Abstract
De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.
| Item Type: | Thesis (Design Project) |
|---|---|
| Supervisor name: | Geertsema, A.A. |
| Degree programme: | Industrial Engineering and Management |
| Thesis type: | Design Project |
| Language: | English |
| Date Deposited: | 13 Dec 2018 |
| Last Modified: | 13 Dec 2018 12:23 |
| URI: | https://fse.studenttheses.ub.rug.nl/id/eprint/18937 |
Actions (login required)
![]() |
View Item |
