Oenema, Keimpe (2020) Improving energy consumption monitoring at FrieslandCampina: A systems engineering approach. Design Project, Industrial Engineering and Management.
Text
Master_IEM_Design Project_2020_KeimpeOenema.pdf Restricted to Registered users only Download (1MB) |
Abstract
De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.
Item Type: | Thesis (Design Project) |
---|---|
Supervisor name: | Jonker, G.H. and Vakis, A. |
Degree programme: | Industrial Engineering and Management |
Thesis type: | Design Project |
Language: | English |
Date Deposited: | 08 Jul 2020 09:39 |
Last Modified: | 08 Jul 2020 09:39 |
URI: | https://fse.studenttheses.ub.rug.nl/id/eprint/22165 |
Actions (login required)
View Item |