Hoiting, Rick, HJ (2021) Meta-heuristic comparison for production scheduling with merging heuristic on job-shop plants considering preventive maintenance. Research Project, Industrial Engineering and Management.
Text
mIEM_2021_HoitingHJ.pdf Restricted to Registered users only Download (1MB) |
Abstract
De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.
Item Type: | Thesis (Research Project) |
---|---|
Supervisor name: | Hubl, A. |
Degree programme: | Industrial Engineering and Management |
Thesis type: | Research Project |
Language: | English |
Date Deposited: | 08 Apr 2021 12:33 |
Last Modified: | 08 Apr 2021 12:35 |
URI: | https://fse.studenttheses.ub.rug.nl/id/eprint/24103 |
Actions (login required)
View Item |