Berg, Wendy van den (2021) Scheduling maintenance on Offshore Wind Farms. Integration Project, Industrial Engineering and Management.
Text
Bachelor_IEM_2021_WendyvandenBerg.pdf Restricted to Registered users only Download (1MB) |
Abstract
De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.
Item Type: | Thesis (Integration Project) |
---|---|
Supervisor name: | Bauso, D. and Jonker, G.H. and Ramirez Juarez, S.G. |
Degree programme: | Industrial Engineering and Management |
Thesis type: | Integration Project |
Language: | English |
Date Deposited: | 21 Jun 2021 12:05 |
Last Modified: | 21 Jun 2021 12:05 |
URI: | https://fse.studenttheses.ub.rug.nl/id/eprint/24653 |
Actions (login required)
View Item |