Berg, Wendy van den (2021) Scheduling maintenance on Offshore Wind Farms. Integration Project, Industrial Engineering and Management.
|
Text
Bachelor_IEM_2021_WendyvandenBerg.pdf Restricted to Registered users only Download (1MB) |
Abstract
De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.
| Item Type: | Thesis (Integration Project) |
|---|---|
| Supervisor name: | Bauso, D. and Jonker, G.H. and Ramirez Juarez, S.G. |
| Degree programme: | Industrial Engineering and Management |
| Thesis type: | Integration Project |
| Language: | English |
| Date Deposited: | 21 Jun 2021 12:05 |
| Last Modified: | 21 Jun 2021 12:05 |
| URI: | https://fse.studenttheses.ub.rug.nl/id/eprint/24653 |
Actions (login required)
![]() |
View Item |
