Straten, Rick van der (2024) Optimizing substation siting and district heating subnetwork design using clustering and shortest path algorithms: A case study at WarmteStad. Design Project, Industrial Engineering and Management.
Text
Master_IEM_Design Project_2024_RickvanderStraten.pdf Restricted to Registered users only Download (15MB) |
Abstract
De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.
Item Type: | Thesis (Design Project) |
---|---|
Supervisor name: | Jonker, G.H. and Bauso, D. |
Degree programme: | Industrial Engineering and Management |
Thesis type: | Design Project |
Language: | English |
Date Deposited: | 23 Jan 2024 14:36 |
Last Modified: | 23 Jan 2024 14:36 |
URI: | https://fse.studenttheses.ub.rug.nl/id/eprint/31845 |
Actions (login required)
View Item |