Javascript must be enabled for the correct page display

Load Tracking of a 160 MW Boiler-Turbine

Klaassens, Abel (2024) Load Tracking of a 160 MW Boiler-Turbine. Integration Project, Industrial Engineering and Management.

[img] Text
BaIPLoadTrackingAbelKlaassens.pdf
Restricted to Registered users only

Download (8MB)

Abstract

De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.

Item Type: Thesis (Integration Project)
Supervisor name: Persis, C. de and Kloosterman, H. and Dai, X.
Degree programme: Industrial Engineering and Management
Thesis type: Integration Project
Language: English
Date Deposited: 02 Jul 2024 13:30
Last Modified: 02 Jul 2024 13:30
URI: https://fse.studenttheses.ub.rug.nl/id/eprint/32992

Actions (login required)

View Item View Item