Gresnigt, N.M.A. (2014) Reducing downtime and costs by eliminating production losses at bottleneck stations. Master's Thesis / Essay, Industrial Engineering and Management.
Text
TBK_MA_2014_Gresnigt_N.M.A..pdf - Other Restricted to Registered users only Download (3MB) |
Abstract
De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.
Item Type: | Thesis (Master's Thesis / Essay) |
---|---|
Degree programme: | Industrial Engineering and Management |
Thesis type: | Master's Thesis / Essay |
Language: | English |
Date Deposited: | 15 Feb 2018 07:59 |
Last Modified: | 15 Feb 2018 07:59 |
URI: | https://fse.studenttheses.ub.rug.nl/id/eprint/12258 |
Actions (login required)
View Item |