Javascript must be enabled for the correct page display

Reducing downtime and costs by eliminating production losses at bottleneck stations

Gresnigt, N.M.A. (2014) Reducing downtime and costs by eliminating production losses at bottleneck stations. Master's Thesis / Essay, Industrial Engineering and Management.

[img] Text
TBK_MA_2014_Gresnigt_N.M.A..pdf - Other
Restricted to Registered users only

Download (3MB)

Abstract

De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.

Item Type: Thesis (Master's Thesis / Essay)
Degree programme: Industrial Engineering and Management
Thesis type: Master's Thesis / Essay
Language: English
Date Deposited: 15 Feb 2018 07:59
Last Modified: 15 Feb 2018 07:59
URI: https://fse.studenttheses.ub.rug.nl/id/eprint/12258

Actions (login required)

View Item View Item