Hooghiemster, Herre (2018) Activity-based costing to allocate energy costs in the production process of BASF Nederland B.V. Heerenveen. Design Project, Industrial Engineering and Management.
Text
Master_IEM_Design Project_2018_Herre Hooghiemster.pdf Restricted to Registered users only Download (1MB) |
Abstract
De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.
Item Type: | Thesis (Design Project) |
---|---|
Supervisor name: | Geertsema, A.A. and Euverink, G.J.W. |
Degree programme: | Industrial Engineering and Management |
Thesis type: | Design Project |
Language: | English |
Date Deposited: | 05 Jul 2018 |
Last Modified: | 05 Jul 2018 14:43 |
URI: | https://fse.studenttheses.ub.rug.nl/id/eprint/17584 |
Actions (login required)
View Item |