Javascript must be enabled for the correct page display

Planning and Scheduling Tool for the Production Plant of Silverton Engineering

Bechlenberg, Alva (2019) Planning and Scheduling Tool for the Production Plant of Silverton Engineering. Integration Project, Industrial Engineering and Management.

[img] Text
2019-04-24_Design_Project_Bechlenberg_Alva.pdf
Restricted to Registered users only

Download (2MB)

Abstract

De begeleider en/of auteur heeft geen toestemming gegeven tot het openbaar maken van de scriptie. The supervisor and/or the author did not authorize public publication of the thesis.

Item Type: Thesis (Integration Project)
Supervisor name: Bosch, A.J.
Degree programme: Industrial Engineering and Management
Thesis type: Integration Project
Date Deposited: 26 Apr 2019
Last Modified: 26 Apr 2019 14:00
URI: https://fse.studenttheses.ub.rug.nl/id/eprint/19397

Actions (login required)

View Item View Item