Javascript must be enabled for the correct page display

Design of logistic route after Paddepoelsterbrug broke down

Kuik, Ruben (2019) Design of logistic route after Paddepoelsterbrug broke down. Integration Project, Industrial Engineering and Management.

[img]
Preview
Text
Integration Project Ruben Kuik.pdf

Download (1MB) | Preview
[img] Text
Toestemming.pdf
Restricted to Registered users only

Download (120kB)
Item Type: Thesis (Integration Project)
Supervisor name: Bosch, A.J. and Ree, C.M.
Degree programme: Industrial Engineering and Management
Thesis type: Integration Project
Language: English
Date Deposited: 11 Jul 2019
Last Modified: 12 Jul 2019 11:43
URI: https://fse.studenttheses.ub.rug.nl/id/eprint/20102

Actions (login required)

View Item View Item